{"id":4643,"date":"2024-10-14T04:32:08","date_gmt":"2024-10-14T04:32:08","guid":{"rendered":"http:\/\/localhost\/pedo\/?p=4643"},"modified":"2024-11-05T04:33:12","modified_gmt":"2024-11-05T04:33:12","slug":"extension-in-deadline-for-submission-of-bids-against-the-tender-detailed-design-manufacture-supply-installation-testing-and-commissioning-of-the-6-95-mw-mujahidin-hydropower-project-at-b","status":"publish","type":"post","link":"https:\/\/pedokp.gov.pk\/?p=4643","title":{"rendered":"Extension in deadline for submission of bids against the Tender \u201cDetailed Design, Manufacture, Supply, Installation, Testing, and Commissioning of the 6.95 MW Mujahidin Hydropower Project at Barandoo River, District Torghar, on an EPC\/Turnkey Basis\u201d"},"content":{"rendered":"\n<p>The prospective bidders interested in the Bidding for \u201cDetailed Design, Manufacture, Supply, Installation, Testing, and Commissioning of the 6.95 MW Mujahidin Hydropower Project at Barandoo River, District Torghar, on an EPC\/Turnkey basis\u201d are hereby informed that the deadline for submission of bids has been extended to November 1, 2024 pursuant to the provisions of IB 19.&nbsp;<\/p>\n\n\n\n<p>The Bid must be delivered to the address given in the Invitation for Bids &#8220;IFB&#8221; at or before 14:00 hours, on November 1, 2024. Bids will be opened on the same day at 14:30 hours, in the presence of bidder\u2019s representatives who choose to attend. Please note that all other terms and conditions of the Bidding Documents remain unchanged.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>The prospective bidders interested in the Bidding for \u201cDetailed Design, Manufacture, Supply, Installation, Testing, and Commissioning of the 6.95 MW Mujahidin Hydropower Project at Barandoo River, District Torghar, on an EPC\/Turnkey basis\u201d are hereby informed that the deadline for submission of bids has been extended to November 1, 2024 pursuant&#8230;<\/p>\n","protected":false},"author":1,"featured_media":0,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[4],"tags":[],"class_list":["post-4643","post","type-post","status-publish","format-standard","hentry","category-all-news-section"],"_links":{"self":[{"href":"https:\/\/pedokp.gov.pk\/index.php?rest_route=\/wp\/v2\/posts\/4643","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/pedokp.gov.pk\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/pedokp.gov.pk\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/pedokp.gov.pk\/index.php?rest_route=\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/pedokp.gov.pk\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=4643"}],"version-history":[{"count":1,"href":"https:\/\/pedokp.gov.pk\/index.php?rest_route=\/wp\/v2\/posts\/4643\/revisions"}],"predecessor-version":[{"id":4644,"href":"https:\/\/pedokp.gov.pk\/index.php?rest_route=\/wp\/v2\/posts\/4643\/revisions\/4644"}],"wp:attachment":[{"href":"https:\/\/pedokp.gov.pk\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=4643"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/pedokp.gov.pk\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=4643"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/pedokp.gov.pk\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=4643"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}