Salient Features:
Location: District Torghar
PC-1 Cost (Original): PKR 4195.66 Million
Capacity: 6.95 MW
Type: Run of the River
Design Discharge: 16.38 Cumec
Net Head: 49.15 M
Length of Power Tunnel: Length = 900 M, Dia = 3.4 M
Transmission: Local Distribution through Grid
Turbines: 2 (Vertical Axis Francis)
Plant Factor: 78.07 %
Annual Average Energy: 49.01 GWh
Annual revenue (Estimated): 343 Million