Discontinuation of Existing Pre-Qualification Process – 10.2 MW Jabori Hydropower Project
PEDO has discontinued the existing pre-qualification process for the 10.2 MW Jabori Hydropower Project and decided to initiate a fresh pre-qualification process under the Direct Supply Model. A fresh Prequalification Document (PQD) exclusively for the Jabori Hydropower Project will be issued, and the process will be re-advertised in due course….
Pre-Interview Merit Lists of Shortlisted Candidates for Various Positions in PEDO
All shortlisted candidates are advised to carefully review their respective Pre-Interview Merit Lists. If any shortlisted candidate finds any discrepancy in his/her own academic qualifications, experience, calculations, or marks reflected in the Pre-Interview Merit List, a written representation along with supporting documentary evidence may be submitted within ten (10) days…
Approved Financial Evaluation Summary for Project “Rehabilitation and Restoration of 17 MW Ranolia Hydropower Project, District Lower Kohistan -Lot-II
Approved Financial Evaluation Summary for Project “Rehabilitation and Restoration of 17 MW Ranolia Hydropower Project, District Lower Kohistan -Lot-II” are attached below:
Financial Evaluation Summary for Design, Manufacture, Installation, Testing & Commissioning of 132 KV GAS Insulated Switchgear (GIS) and Associated Works at Ranolia HPP District Lower Kohistan PEDO
Approved Financial Evaluation Summary for Design, Manufacture, Installation, Testing & Commissioning of 132 KV GAS Insulated Switchgear (GIS) and Associated Works at Ranolia HPP District Lower Kohistan PEDO are attached below:
Technical Evaluation Summary for Project “Rehabilitation and Restoration of 17 MW Ranolia HPP, Kohistan- Lot-II
Approved Technical Evaluation Report for Rehabilitation & Restoration of 17 MW Ranolia Hydropower Project at District Lower Kohistan Lot-II are attached below.
