Approved Financial Evaluation Summary for Project “Rehabilitation and Restoration of 17 MW Ranolia Hydropower Project, District Lower Kohistan -Lot-II
Approved Financial Evaluation Summary for Project “Rehabilitation and Restoration of 17 MW Ranolia Hydropower Project, District Lower Kohistan -Lot-II” are attached below:
Financial Evaluation Summary for Design, Manufacture, Installation, Testing & Commissioning of 132 KV GAS Insulated Switchgear (GIS) and Associated Works at Ranolia HPP District Lower Kohistan PEDO
Approved Financial Evaluation Summary for Design, Manufacture, Installation, Testing & Commissioning of 132 KV GAS Insulated Switchgear (GIS) and Associated Works at Ranolia HPP District Lower Kohistan PEDO are attached below:
Technical Evaluation Summary for Project “Rehabilitation and Restoration of 17 MW Ranolia HPP, Kohistan- Lot-II
Approved Technical Evaluation Report for Rehabilitation & Restoration of 17 MW Ranolia Hydropower Project at District Lower Kohistan Lot-II are attached below.
Approved Technical Bid Evaluation Report ( T-BER) for 6.95 MW Mujahidin Hydropower Project at Barandoo River, District Torghar
Approved Technical Bid Evaluation Report ( T-BER) for 6.95 MW Mujahidin Hydropower Project at Barandoo River, District Torghar are attached below. Download
Minutes of the Pre-bid Meeting on Civil Works Lot#2 for Rehabilitation and Restoration of 17 MW Ranolia Hydro-Power Project – Addendum No. 1
The pre-bid meeting minutes is attached below.
Instructions for Qualified Candidates (3rd Phase)
With reference to the screening test held on September 16 and September 17, 2025, for various BPS-17 and below positions in PEDO conducted by ETEA, all qualified candidates (who have secured 50% or above marks) are hereby informed to carefully read and comply with the following instructions. The last date…