Solarization of 2000 Masajid in KP

Project Brief:

The project will provide quick and cost-efficient alternate energy for already over stretched national grid electricity through solar energy. 1st Priority will be given to the Masajid & Worship places located in Off-grid areas and 2nd priority will be given to the Masajid & Worship places located in heavy load shedding areas & the 3rd priority will be given to those Masajid which have solar system but in need of strengthening, against the provided list. The list of Masajid & Worship places will be provided by the Competent Authority which will be further forwarded by the administrative department on requirement/need basis.

Salient Features:

PC-I Cost: PKR. 1,759.619 Million

Completion Period: 1.5 Year

Completion Date with DLP: 30th June, 2025

Total Masajid to be Solarized: 2000

Capacity: 4.32 MW

Annual Energy (MWh): 23.76 MWh/Year

Annual Saving: 75 Million/year

Current Status:

  • Survey of all Sites Completed
  • Partial Installations Initiated.

Challenges Faced During Implementation:

  • Delays being faced due to restriction on imports under Pakistan Tariff Codes HS 84 & 85 and processing of LCs

The proposed solar systems will be based on provision of following main items:

  • Tier 1, A Grade Mono Crystalline Photo Voltaic Panels.

  • Advance Backup technology Lithium-ion Batteries with high life cycle and deep discharge rate.

  • Off grid hybrid inverters having built in MPPT with high better conversion efficiency.

  • Energy Efficient Ceiling Fans.

  • Energy Efficient LED light bulbs.

  • Voltage regulators.

  • Protective devices (SPDS & OVDs etc.).

  • Earthing /grounding.

  • Hot dipped galvanized PV mounting structure.