PEDO – Pakhtunkhwa Energy Development Organization

Evaluation Reports
S. NoDescription of DocumentDetails
1Hiring of Security Firms for Operational Hydropower Projects in Lots (I, II & III) Final Evaluation Report.Download
2Price Bid Evaluation Report (P-BER)” for the Project “Detailed Design, Manufacture, Supply, Installation, Testing and Commissioning of 6.95 MW Mujahidin Hydropower Project at Barandoo River, District Torghar On EPC/Turnkey BasisDownload
3Bid Evaluation Report for Procurement of Information Technology Equipment (Up-Gradation of Network Infrastructure) at PEDO Head OfficeDownload