Final Evaluation Report for the work "Clearance of Flood Debris Upstream of Weir to Avoid Generation Loss, Rising of Plum Wall with slope stability works upstream of Power House.
20-06-2024
Final Evaluation
Report for the work "Clearance of Flood Debris Upstream of Weir to Avoid
Generation Loss, Rising of Plum Wall with slope stability works upstream of
Power House is attached below