Project Brief
The
project is located at village Alo Tehsil Katlang, District Mardan of Khyber
Pakhtunkhwa Province (KPK) on Machai Canal, which is a part of Upper Swat Canal
System off-taking from Amandara Headworks on River Swat.
It
is the provincial hydel project, which delivers 2.6 MW active power to the
National Grid at Katlang through an 11 KV Transmission Line. Kaplan type-1
Turbine capable of generating approximately 2.6 MW under maximum water flow
conditions (40 m3/sec) with the net head of 7.88 meters is being used
for the generation of power.
Operation
& Maintenance (O&M) was outsourced to M/S Hydro Tech Pak. Pvt. Ltd. on September
1, 2014. O&M Contract expired on January 31, 2023 and after the expiry of
the said contract, PEDO decided to take over the Operation & Maintenance on
the pattern of self/indigenous O&M from February 1, 2023.
|
Capacity |
2.6 MW |
Design Discharge |
40 m3/sec |
Net Head |
7.88 m |
Length of Channel |
1.5 Km |
Annual Energy
|
15.784 GWh |
COD |
18th May, 2020 |
Tariff |
|
Levelized (1-30 Years) |
Rs. 4.6710/kWh |
Achievements
· PEDO for
the first time is running the project through its own staff who are operating
it successfully since its energization; thus, is saving a huge cost of O&M
out sourcing.
·
Moreover,
PEDO Board has approved the Captive generation to industries, which will
increase the revenue of the power plant and will provide impetus to the local
industries.