• Facebook

  • Poll

  • Email

  • Contact us

Pakhtunkhwa Energy Development Organization

  • HOME
  • ABOUT PEDO
    • History
    • PEDO Introduction
    • Vision & Objective
    • CEO Message
    • Management Committee
    • Pedo Policy Board
  • PUBLIC SECTOR
    • Ongoing Projects
      • Jabori Hydropower Project
      • Gorkin Matiltan HPP
      • Karora Hydropower Project
      • Solarization of 100 Villages
      • Lawi HPP
      • Koto HPP
      • Balakot Hydropower Project
    • Operational Projects
      • Malakand III Powerhouse
      • Pehur Powerhouse Swabi
      • Reshun Powerhouse Chitral
      • Shishi Powerhouse Chitral
      • Ranolia Hydropower Complex
      • Machai Hydropower Plant Mardan
      • Daral Khwar Hydropower Project
    • KHRE
      • Variable Renewable Energy Loctional Study
      • Hydropower Resources of Pakistan (PPIB)
      • Renewable Energy Resource Mapping in Pakistan
    • Future Map
  • PRIVATE SECTOR
    • Solicited Sites
    • Semi Raw Sites
    • Raw Sites
    • Solar
  • KP HYDROPOWER POLICY
    • Federal Power Policy
    • ADB Policy for Access to Clean Energy
    • KP Hydropower Policy 2016
    • Guidelines to KP Hydropower Policy
  • SOCIAL UPLIFT
    • "Ujaloon Ka Safar"
    • Solarization of Schools & Health Facilities
  • NEWS
  • EVENTS
  • TENDERS
  • DOWNLOADS
  • ICT Services
    • File Tracking System
    • Task Management System
    • Asset Management System
    • Attendance Management System
  • E-TENDER

Departments
CEO Office Hydrology Planning & Facilitation Finance & Administration Phone Directory M & E
Machai Hydropower Plant Mardan

Name of the Project:                                      2.6 MW Machai Hydropower Complex

Location:                                                          Machai Canal (RD 68+565) near Village ALO

Brief of the Project:

The project is located near Katlang in District Mardan of Pakhtunkhwa Province (KPK) on Machai Canal, a part of Upper Swat Canal System off-taking from Amandara Headworks on River Swat. The project covers the area on Machai Canal from its RD 68+450 near Alo village to RD 70+830, covering three falls on the Canal. The Government of Khyber Pakhtunkhwa, Pakistan decided to implement the subject Project in Khyber Pakhtunkhwa, through Pakhtunkhwa Energy Development Organization (PEDO) on EPC “Engineering, Procurement and Construction” Basis.

Salient Features:                                       

Location of Project

Machai Canal (RD 68+565) near Village ALO

Water Source

Machai Canal (River Swat)

Design Discharge

40 m3 /sec

Net Head

7.88 meters

Turbine

Kaplan Type-1 Unit (Vertical Double Regulated)

Generating Capacity

2.6 MW

Transformers


  

Main (Step up) 6.3 KV to 11 KV

Auxiliary (Step down) 11 KV to 0.4 KV

Switchyard

15m x 30 m

Transmission Line

12 km (To be Connected with 132KV   Grid Station at Katlang, Mardan)

Name of O&M Contractor:

M/s Hydro Teck (Pak) Pvt Ltd

  

Resident Engineer Contact No:

 Mr. Saeed Ul Haq

Phone:  03455527555





Quick Links


  • HOME
  • NEPRA
  • WAPDA
  • PESCO
  • NTDC
  • PPIB
  • AEDB

Contact Us


Postal Address
Plot# 38, Sect B-2, Phase-5 Hayatabad Peshawar.
Phone: +92-91-9217330 Fax: +92-91-9217331
Email
info@pedo.pk



Copyright © 2016- 2023. Designed and Developed by Web Technologies, IT Excellence Centre, Directorate of IT, GoKP. All Rights Reserved.